Although MOKEN is move aboard ready, we’ve already got a few projects lined up for the coming months. Some for safety, some for functionality and some just for fun!
- Hypervent mattress pad under queen island bed in master stateroom. – COMPLETED
- Caframo Sirocco 24 VDC marine fans throughout. – COMPLETED
- Allegro 220 VAC built-in marine vacuum system. – COMPLETED
- Whale Gulper 320 24 VDC pumps and 2 GAL grey waste sumps (fore and aft). – COMPLETED
- Phifertex window shades for pilothouse. – COMPLETED
- Remove anti-skid from deck edges, repaint white on deck and reapply anti-skid. – COMPLETED
- Reverso 24 VDC 3 valve oil change system for main engine, generator, and gearbox. – COMPLETED
- STIDD helm chair in black ultra-leather. – COMPLETED
- LED spreader lights. – COMPLETED
- Replace dinghy and redesign davits. – COMPLETED
- Replace collapsible bimini with permanent design. – COMPLETED
- Solar panels with Outback MPPT charge controller. – COMPLETED
- Deck mounted propane locker. – COMPLETED
- D400 wind generator. – COMPLETED
- LED reading lights. – COMPLETED
- RearView Systems STM704QHDZ digital commercial duty rear view camera / backup camera video system – four cameras to include engine room, marina deck, cockpit, and deck. – COMPLETED
- Eclelectic Energy D400 24 VDC wind generator with NCHC-24 controller. – COMPLETED
- Stainless steel aft rope reel. – COMPLETED
- Ozefridge Eutectic refrigeration system for chest freezer. – COMPLETED
- Two INOX CR130 stainless DC fridges for galley. – COMPLETED
- FLIR M-Series Dual Payload (thermal imaging and visible light camera). – COMPLETED
- Fireboy-Xintex manual/automatic fire suppression system with auto shutdown of main engine, generator, and blowers. – WISH LIST
- Partial glass shower wall in master head. – WISH LIST